|
|
|
|
Step 5: Install the decking - Laying
deck boards
|
|
|
|
Abstract |
Once the framing step is over,
it's time to attach the floor
planks to the backyard arched
bridge stringer. First of all,
place the slats at both ends of
the bridge. Use cedar as
material (no rot). Drill pilot
holes, leave a gap between
boards and fasten with 3" deck
screws. |
|
Learn how to frame a curved
garden bridge deck. |
|
► |
Detailed instructions |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water Garden Bridge
Plan |
|
|
|
|
|
|
|
|